1-866-216-7742
← Back to Blog

Complete Copier Installation Checklist for IT Managers

February 23, 2026 · Copier Lease Returns

A step-by-step copier installation checklist for IT managers — from delivery and setup to network configuration and user training.

Copier Installation Checklist for IT Managers

Phase 1: Pre-Delivery

  • • [ ] Confirm installation location has adequate floor space
  • • [ ] Verify floor can support machine weight (200–400 lbs for floor copiers)
  • • [ ] Ensure dedicated 15–20 amp electrical circuit is available
  • • [ ] Confirm network drops or WiFi coverage at the location
  • • [ ] Clear pathways from building entrance (measure doorways)
  • • [ ] Arrange freight elevator access if needed
  • Phase 2: Delivery & Physical Setup

  • • [ ] Inspect external packaging for damage before crew leaves
  • • [ ] Remove all shipping materials (drum locks, foam, tape)
  • • [ ] Level the machine using built-in leveling feet
  • • [ ] Install paper trays and finishing equipment
  • • [ ] Load paper with correct size settings
  • • [ ] Connect to dedicated electrical circuit
  • • [ ] Power on and verify startup completes without errors
  • Phase 3: Network Configuration

  • • [ ] Assign a static IP address (document in your network map)
  • • [ ] Configure subnet mask, gateway, and DNS
  • • [ ] Set machine hostname per your naming convention
  • • [ ] Deploy print driver via Group Policy or MDM
  • • [ ] Test printing from representative workstations
  • • [ ] Configure scan-to-email (SMTP settings + authentication)
  • • [ ] Configure scan-to-folder (map shared folders with correct permissions)
  • • [ ] Change default admin password — critical security step
  • • [ ] Enable hard drive encryption
  • • [ ] Configure user authentication (PIN, badge, or AD integration)
  • Phase 4: User Setup & Training

  • • [ ] Create user accounts or sync with Active Directory
  • • [ ] Assign department codes if using print accounting
  • • [ ] Set default print settings (duplex, B&W defaults)
  • • [ ] Schedule training sessions for key user groups
  • • [ ] Designate a "super user" in each department
  • Phase 5: Documentation

  • • [ ] Record serial number, IP address, and admin credentials in asset management
  • • [ ] File warranty documentation and service agreements
  • • [ ] Record initial meter readings (color and B&W)
  • • [ ] Document vendor support contact and escalation path
  • • [ ] Schedule 30-day follow-up
  • [Need copier delivery with installation? →](/services/white-glove-delivery)

    Need Copier Shipping or Office Moving?

    Get a free, no-obligation quote from Copier Lease Returns today.

    Get a Free Quote